Declaration Did Not Grant Commercial Owner Easement Rights To Access Neighbor’s Utility Services

John Donne famously preached that “No man is an island,” stressing humanity’s interconnectedness. This 17th century notion serves as the perfect conceptual metaphor for a declaration of reciprocal covenants affecting commercial real estate.While the former is a 17th-century meditation on human interconnectedness, the later is a modern real estate and contract tool designed to legally enforce that same interdependence (or lack thereof), as two commercial space owners learned in Real Estate Naperville II, LLC v. E&S Management Group LLC Waterside Center Series, 2026 IL App (3d) 250183-U. As the Third District’s deep dive into the language and intent behind the relevant declaration provisions highlights, owners (or potential owners) are well-advised to understand and appreciate how recorded restrictions, shared obligations, and easements may affect the use of their property. Overlooking these issues can result in expensive legal disputes between neighbors.

Facts

Real Estate Naperville II involved a dispute between adjoining commercial property owners in a strip mall. Real Estate Naperville II, LLC (REN2), was the owner of Lot 3, and E&S Management Group LLC Waterside Center Series was the owner of Lot 2. 2026 IL App (3d) 250183-U at ¶2. At one point, Lots 2 and 3 were an undivided parcel that, upon division, became subject to a governing recorded declaration of reciprocal easements and restrictive covenants. 2026 IL App (3d) 250183-U, ¶¶8 – 9. REN2’s space had historically relied on components of E&S Management Group’s fire suppression system, electrical infrastructure, gas meters, and other utility-related facilities located on or connected through E&S Management Group’s property. 2026 IL App (3d) 250183-U at ¶¶2, 14. Unlike Lot 2, Lot 3 did not have a complete fire sprinkler system that connected to the fire alarm control panel and the municipal water main; it relied on its connection to Lot 2’s system. 2026 IL App (3d) 250183-U at ¶14. REN2 also connected to Lot 2’s electric transformer, and Lot 3’s natural gas pipes and gas meter were attached to the side and roof of Lot 2. Id. REN2 relied on the declaration as support for its right to connect to Lot 2’s systems and to attach its piping and meter to Lot 2’s building and roof. 2026 IL App (3d) 250183-U at ¶16. REN2 similarly relied on a 2003 planned unit development (PUD) plat to claim an easement allowing it to use a pylon sign on E&S Management Group’s property. 2026 IL App (3d) 250183-U at ¶23.

After E&S Management Group acquired Lot 2, it informed REN2 that it intended to disconnect REN2’s components and other electrical conduit from E&S Management Group’s property. 2026 IL App (3d) 250183-U at ¶¶2 – 3, 15. Over the next two years, without success, E&S Management Group asked REN2 to disconnect its components from E&S Management Group’s system. 2026 IL App (3d) 250183-U at ¶15. About 18 months later, upon E&S Management Group obtaining permits to effectuate the disconnection, REN2 sued for declaratory relief and breach of contract, while E&S Management Group counterclaimed for trespass, declaratory relief, and breach of the governing declaration. 2026 IL App (3d) 250183-U at ¶¶2 – 3, 15 – 17. REN2’s request for a temporary restraining order to prevent the disconnection was denied by the trial court, and the actual disconnection occurred nearly three years after E&S Management Group first informed REN2 of its disconnection plans. 2026 IL App (3d) 250183-U at ¶¶3, 18 – 19. The trial court further denied the parties’ cross-motions for summary judgment, finding that the relevant declaration provisions relied on by the parties were ambiguous on their faces, and there was insufficient evidence of the drafters’ intent to resolve the declaration’s ambiguities. 2026 IL App (3d) 250183-U at ¶20.

The trial court largely ruled in REN2’s favor after a bench trial. 2026 IL App (3d) 250183-U at ¶¶5, 22. It found that the declaration gave REN2 a nonexclusive easement to use E&S Management Group’s property for utility services, including connections to E&S Management Group’s fire suppression, electrical, gas, and water-related systems. 2026 IL App (3d) 250183-U at ¶¶5, 11, 22. Based on that interpretation, the trial court held that E&S Management Group breached the declaration by disconnecting REN2’s fire suppression components, thereby leaving Lot 3 without any fire suppression and other systems, and awarded REN2 damages for the cost of installing its own system. 2026 IL App (3d) 250183-U at ¶¶5, 23. The trial court rejected E&S Management Group’s breach and trespass claims and entered injunctive relief against E&S Management Group, permanently enjoining E&S Management Group from disconnecting any of Lot 3’s remaining utility services and removing its pipes from along Lot 2’s building and roof. 2026 IL App (3d) 250183-U at ¶¶5, 22 – 23. It did, however, find that the 2003 PUD plat did not give REN2 an easement over E&S Management Group’s parcel for use of a pylon sign located on Lot 2. 2026 IL App (3d) 250183-U at ¶23. The trial court denied both parties’ requests for attorneys’ fees. Id.

Appellate Court

In its de novo review, the appellate court found that the declaration provided neither party an easement over their neighbor’s utility connections. 2026 IL App (3d) 250183-U at ¶¶33, 36, 48. The appellate court did not find the declaration’s language ambiguous; it reached the opposite conclusion. 2026 IL App (3d) 250183-U at ¶40. In reaching its decision, the appellate court reviewed Illinois easement law and closely examined the language of the declaration. 2026 IL App (3d) 250183-U at ¶¶36 – 48.

The appellate court found that the declaration’s easement language permitted construction, installation, or maintenance of utility lines but did not give one parcel owner the right to attach to or use another owner’s complete utility systems, vaults, meters, or fire suppression infrastructure. 2026 IL App (3d) 250183-U at ¶¶39, 42 – 43, 48. Indeed, the declaration explicitly stated that the individual owners of Lots 2 and 3 were each separately responsible for their own respective vaults. Id. Thus, the appellate court concluded that reading the declaration to establish an easement for REN2 or E&S Management Group to connect to their neighbor’s utility vaults and other components was internally inconsistent with other portions of the declaration and would render certain of its provisions superfluous. 2026 IL App (3d) 250183-U at ¶47.

Because the appellate court rejected REN2’s claimed utility easement, it reversed several key parts of the trial court’s judgment. Specifically, it reversed the ruling in REN2’s favor on declaratory relief, reversed the permanent injunction against E&S Management Group, reversed REN2’s breach of contract judgment and damages award, and revived E&S Management Group’s utility-related trespass claims for further proceedings on damages. 2026 IL App (3d) 250183-U at ¶58, 77. The court also held that the trial court erred in treating E&S Management Group’s utility trespass claim as moot simply because some components had been removed before trial; trespass damages could still exist for the period before removal, and ongoing utility-related encroachments also remained at issue. 2026 IL App (3d) 250183-U at ¶52.

The appellate court did affirm the lower court’s ruling regarding the pylon sign, finding that the survey notation stating, “1-4 [inch] PVC CONDUIT FOR LOT 3 SIGN,” was insufficient to establish an easement over Lot 2 for Lot 3 to maintain the pylon sign on its neighbor’s parcel. 2026 IL App (3d) 250183-U at ¶¶70 – 77. Although the appellate court upheld E&S Management Group’s pylon sign trespass claim against REN2, it reversed and remanded the matter for further proceedings because the trial court failed to provide a proper remedy for REN2’s ongoing trespass. Id. Finally, the court affirmed the denial of attorneys’ fees to both parties because neither showed entitlement under the declaration’s fee provision, which applied only to failures to maintain a parcel in a safe condition. 2026 IL App (3d) 250183-U at ¶¶78 – 83.